Current QPod Case Studies Include:
- Carriglass Hotel, Longford
- Clongriffin Town Square, Dublin
Bowen Construction Ltd; Carriglass Hotel, Longford
Completed: May 2007 Client: Kearnes Development / Bowen Construction Ltd Total Value of Pods: €1,036,800.00 Superstructure on Project: Pre-cast wall and slab Number of Pods: 96 bathrooms Pod Structure: Steel Frames, cement board Interface Details: Seperate bath and shower Specification of Pod Interior: High Specification, 4* Hotel Programme Information: Pods installed over 3 month period
Danninger Construction;Turvey Avenue, Inchicore
Client: Danninger Total Value of Project Overall: €000,000.00 Superstructure on Project: Traditional block and in-situ concrete floor Number of Pods:145 Pod Structure: Steel frame Interface Details: Bathroom and en-suite constructed as one unit with slim floor construction Specification of Pod Interior: High specification interior fit out for private sale Programme Information: 2 Months